VHB VELOCITY LED HIGHBAY - INSTALLATION GUIDE (DIMMABLE VERSION SHOWN)
J-HOOK/PENDANT INSTALLATION EXAMPLE
Blue
Brown
Brown
Blue
Universal AC input: AC100-277V, 50/60Hz. 1-10V Dimming is Optional Configuration, By Request
Wiring Block Diagram
U-BRACKET INSTALLATION EXAMPLE
Drill and prepare holes for fixings
Align the bracket with the expansion plugs
Tap the expansion plug into hole
Adjust the M5 screws on the side of U-bracket to rotate and position the luminaire as required
Connect mains power to the correct wire. Connect 1-10V dimming control line (optional).
Fix and tighten the fixing screws
All product specifications are subject to change without notice. Please re-confirm product details prior to ordering as actual specifications ordered may vary. Detailed photometric report and IESNA, LM79 and LM80 files available by request.
Powered by FlippingBook